Swamp Area Gas Gathering for N-LNG Gas Supply T4/5 EPC for Upgrading of Ogbainbiri
Flow-station
|
|
NAOC/ DAEWOO/
B•G&S NIGERIA LIMITED
|
Design of the Structural, Civil and Piping system around the newly installed Tank at Ogbainbiri Flow-station
|
Gas Line Pig Launcher Engineering Scope of Work
|
|
SEPLAT Dev. Co.
Ltd./Contour NIG LTD
|
PDMS Model, Complete Piping. Process and Structural Design including Piping Spooling and construction support to enable installation of Pig Launcher
|
Mechanical Design and Generation of Fabrication drawings for Pig launchers and scrubber at Sapele, Amukpe and Ovhor
|
|
Contour NIG LTD
/SEPLAT
Dev. Co. Ltd.
|
Equipment wall thickness calculation.
Generation of fabrication drawings for pig traps and the scrubbers and Mechanical Analysis of all Equipment
|
Generation of Fabrication drawings for Produced Water Discharged Line Project
|
|
OCO Ind. Services Limited/ MOBIL Producing Pet.
Ltd.
|
Generation of Spooling
and Cut-sheet (construction Support)
|
Generation of Fabrication drawings
|
|
NPDF
Benin/Network Oil& Gas Ltd
|
Generation of Fabrication drawings
|
Man power Supply of Engineers and PDMS Operator to Saipem via Kohasa for SSGGPP Project
|
|
|
Supply of PDMS Designer. Discipline Design Engineers
|
Engineering Consultancy for Relief Valves
|
|
|
To change the configuration of Relief Valves connected at 6 O’Clock to
12 O’Clock
|
Detailed Engineering Design Services For The Roberkiri Field Produced Water Handling Debottlenecking Project
|
|
Belema Oil
/Rovicon Nig Ltd
|
Detail Engineering for produce water management
|
Ebendo Flowstation Integrated Metering Project
|
|
|
Detail Engineering Design for the installation of metering Skid
|
Energizing Of Education Project (Phase1)- Supervision Of Metallic Structure Prefabrication And Erection Of The Metallic Structures, Pannels And Relative Equipment For Project
|
|
Mekta / Rural Electrification Agency
|
|
Provision of Engineering design for wire water system, heater line to turbine and others.
|
|
|
Detail Engineering design
|
Gas – Scrubber and heating mechanism project
|
|
|
|
Fabrication/ Construction of Gas – Scrubber and heating mechanism project
|
|
|
|
Construction of Gas – Scrubber and heating mechanism project
|
|
Tomsy Engineering and Services/ Platform Petroleum Limited
|
|
Fabrication/ Construction of Gas – Scrubber and heating mechanism project
|
|
|
Detail Engineering design
|
Upgrade and Integration of Nitrogen Generation Package Project
|
|
|
|
FEED for Oza 20,000 BPD EPF Project
|
|
Millenium Oil and Gas Ltd
|
|
|
|
|
|
Resurfacing Re-Design for PH MC Flowlab Yard
|
|
|
|